A restaurant or café has two jobs at once. The dining room has to make guests want to stay and come back, and the kitchen has to keep pace on the busiest night. The design and fit-out has to get both right, and finish on the date you have promised the market.
This guide follows a new F&B venue in Dubai from the lease to opening day, focusing on the design and fit-out decisions that matter most.
Quick answer
To open a restaurant or café in Dubai, you typically secure the space and trade licence, develop the concept, design the dining room and kitchen together, get the layout approved (food safety, Civil Defence and the landlord), build and install, pass the inspections, then train the team and soft-open. Kitchen design and approvals are the steps most likely to delay opening, so start them first.
Key facts
- A food business needs a trade licence, from the Department of Economy and Tourism on the mainland or the free-zone authority. (Dubai Department of Economy and Tourism)
- The kitchen layout of a new food establishment is reviewed for food safety before fit-out starts. (Dubai Municipality)
- Fire and life-safety systems, including kitchen fire suppression, need Dubai Civil Defence approval. (Dubai Civil Defence)
- Forklyft Studio designed Ala Vista Cafe in Ajman and offers fast-track, milestone-driven delivery for F&B openings. (Forklyft Studio)
1. Before you sign the lease
Many restaurant problems are decided before the first drawing. Before you sign, check:
- Extraction: is there a route for kitchen exhaust, and does the building allow it?
- Drainage: can a grease trap be installed, and where does the drainage run?
- Power and gas: is the available supply enough for your kitchen equipment?
- Landlord's F&B rules: malls and towers usually have their own fit-out guidelines for restaurants.
- Fit-out period: how much time you have before rent starts, and whether it matches a realistic programme.
Tip: bring your designer to the site before you sign. A short visit can reveal an extraction or drainage problem that would be expensive to solve later.
2. Concept and guest experience
A guest decides how they feel about a venue in the first few seconds, long before the menu. The concept defines the story the space tells: the mood, the materials, the lighting and how the room should feel at lunch versus late evening. It also shapes the practical layout, because the menu decides what the kitchen needs.
3. Design front and back of house together
The dining room and the kitchen should be planned at the same time, not one after the other. Good restaurant design plans:
- Seating and covers: a mix of tables, banquettes and bar seats that suits your service style
- Guest journey: entrance, waiting, seating, toilets and exit
- Service flow: short, clear routes between kitchen, pass and tables, without crossing guests
- Storage: dry, cold and frozen storage, deliveries and waste

4. Kitchen and MEP
The kitchen is the most technical part of the project. Exhaust hoods and extraction, fresh air, drainage and grease traps, power, gas or electric cooking, and refrigeration all have to be coordinated with the equipment list from your operator or supplier. This coordination is also what the authorities review, so it needs to be resolved early and properly.
Opening a restaurant or café? Book a free consultation or message us on WhatsApp. One team designs, builds and furnishes it.
5. Approvals
A new food business in Dubai usually needs several approvals. The exact list depends on the location (mainland or free zone), the building and your concept, but typically includes:
- A trade licence for the food business, from the Department of Economy and Tourism on the mainland or the relevant free-zone authority
- Food-safety approval of the kitchen layout and design before fit-out, from Dubai Municipality or the authority for your area
- Civil Defence approval for fire and life-safety systems, including kitchen fire suppression
- Landlord or mall approval of your drawings, plus any signage permits
Confirm the full list with your landlord and the authority before you build. Submitting a well-resolved kitchen design early is the single best way to protect your opening date.
6. Build and fit-out
Once approvals are in place, the build follows a milestone-driven programme: strip-out, MEP and extraction, ceilings and fire-safety systems, flooring and wall finishes, joinery and counters, kitchen equipment installation, then final finishes. For a launch with a fixed date, a fast-track programme compresses these stages by running production and site works in parallel.
Bespoke counters, banquettes and display units are made while the site work progresses, so they are ready to install on time. That is how our restaurant and hospitality projects are planned, with design and build under one team.
7. Furniture, lighting and atmosphere
Lighting, acoustics and furniture are what guests remember. Layered lighting that changes from day to night, materials that are warm but hard-wearing, and seating that is comfortable for the length of a typical visit all shape how long guests stay and whether they return.

Project
Ala Vista Cafe, Ajman
A modern, minimalist café interior designed around the brand: sleek, clean lines softened by earthy textures, hanging greenery and light wood finishes, creating a calm, contemporary coffee destination. See the project in our portfolio.
8. Inspections and opening
Before opening, the space is inspected, including by Civil Defence and the food-safety authority where required. After handover and snagging, plan a few days to train the team in the new space and run a soft opening, so service is smooth when the doors open to the public.

Mistakes to avoid
- Signing a lease without checking extraction, drainage and power
- Designing the dining room first and squeezing the kitchen into what is left
- Starting the build before the kitchen design is approved
- Choosing finishes that look good on day one but are hard to clean and maintain
- Leaving no time for inspections, training and a soft opening
Your restaurant opening checklist
- Site checked for extraction, drainage, power and gas before signing
- Landlord's F&B fit-out guidelines received
- Concept, menu and service style defined
- Dining room and kitchen designed together, with the equipment list
- Trade licence, food-safety, Civil Defence and landlord approvals submitted early
- Bespoke furniture and counters in production during site works
- Inspections booked into the programme
- Staff training and soft opening planned
Sources
- Dubai Department of Economy and Tourism (trade licences)
- Dubai Municipality (food safety)
- Dubai Civil Defence
- Kayrouz & Associates: UAE food business compliance and licensing
Rules and procedures in Dubai change. This guide reflects our understanding as of 20 November 2026; always confirm current requirements with your landlord and the relevant authority.
Your Project
Planning a project in Dubai? Book a consultation or message us on WhatsApp and tell us about your space.